Blue Star Gold Announces Phase 2 Exploration Drilling Results at Auma Project - Bamako Prospect Returns 1.9 m of 16.74 g/t Au and 2.0 m of 10.6 g/t Au
Drill Intercepts ⛏
6/1016.74 g/t AU · 1.9m
6/1010.6 g/t AU · 2.0m
Analyst Takeaways
- Phase 2 drill results at Bamako Prospect returned high-grade gold intercepts of 16.74 g/t Au over 1.9m and 10.6g/t Au over 2.0m, both significantly above the >5 g/t Au threshold for high-grade mineralization.
- These are initial results from Blue Star's first drill program at the Auma Project, indicating early-stage exploration success at a previously untested prospect.
- The Company is positioned as a leading explorer in Canada's North with strategic project locations along the proposed Grays Bay Road corridor in the High Lake region.
- The Auma Project is prospective for both gold and critical metals, providing potential diversification beyond traditional gold exploration upside.
AI-generated · verify against original source
Vancouver, British Columbia--(Newsfile Corp. - August 26, 2026) - Blue Star Gold Corp. (TSXV: BAU) (OTCQB: BAUFF) (FSE: 5WP0) ("Blue Star" or the "Company") announces initial results from Phase 2 of its 2026 Exploration Program at the Auma Project. This is the Company's first drill program at this highly prospective area for both gold and critical metals. Blue Star is a leading explorer in Canada's North with its projects strategically located along the proposed Grays Bay Road in the High Lake...
Frequently Asked Questions